PUBLIC WORKS PROJECT

Installed new 240 ft long sewer line.

Installed (2) new manholes @ 12’ deep and sewer laterals.

Installed new gas line and laterals.

Repaired City street.

Asphalt slurry street repair throughout.

Previous
Previous

Ridgemont Dr

Next
Next

Escondido Beach Road | Malibu